DIY Kitchen Remodel in Rockford, IL

Updated

What to expect

Get a free quote

We reply with a price. Nothing is booked until you say yes.

How we work with owners who do part of the job

Plenty of owners want to do some of the work themselves. We are fine with that. Here is how it works with us.

  • You tell us which parts you want to keep: demolition, painting, hardware or backsplash.
  • We price the rest, and the hired parts are written into the contract separately.
  • We pull the permit for the trade work, so the licensed work stays in a licensed contractor's name.
  • We tell you up front how owner-done parts affect the schedule and the warranty.
  • We point out lead, wiring and gas problems before you pick up a tool.

Some contractors will not warranty a job that includes owner-supplied or owner-installed parts, so say so up front.

What Illinois lets an owner do

Under the Illinois Plumbing License Law, an owner-occupant of a single-family home may do plumbing in that home if it meets the Illinois Plumbing Code and is inspected, and any helper has to be a licensed plumber. Rockford goes a step further in writing: a resident owner may do their own plumbing, mechanical and electrical work in a single-family home. Anyone else needs a licensed plumbing or mechanical contractor or a registered electrician.

Other towns can be stricter than the state, and a few do not publish what they allow. Call your town's building office before you buy a pipe. The phone numbers are on our kitchen remodel permits page.

The lead rule treats you differently than a crew

The EPA lead rule applies to paid contractors who disturb paint in pre-1978 homes. It does not cover homeowners working on their own home. So the same demolition is regulated for a hired crew and not for you. The dust is the same either way. In Rockford 60.3% of homes were built in 1969 or earlier, so assume a painted surface may hold lead and plan the work accordingly. EPA's Renovate Right pamphlet explains lead-safe practices for families. If you pay a friend or a day laborer, the rule can apply to them.

Where the money is in a kitchen job

Labor is about a quarter of the total on a kitchen remodel. That is the ceiling on what doing everything yourself can save, before the cost of tools, mistakes and time. A kitchen costs most of its money in cabinets, counters and appliances, which you pay for either way. In the Rockford metro, the mean carpenter wage is $36.17 an hour, electricians $43.10 and plumbers $43.19. Those are what you offset for the hours you do yourself.

Where owners usually get value is in the labor that needs patience, not licenses: demolition, painting, hardware and backsplash. The whole picture of prices is on the kitchen remodel cost page.

Common kitchen tasks and where owners usually stop
TaskOwner-friendly?Why
Demolition and haul-awayUsuallyWatch for lead paint, and know what is behind the wall before you cut. See the rule above.
Painting walls and cabinetsUsuallyTime and prep, not skill.
Hardware and knobsYesLow risk and fully reversible.
Backsplash tileOftenNeeds patience and layout. A small area is a good first tile job.
Replacing a faucet or like-for-like fixtureOftenRockford exempts same-location replacement from a plumbing permit.
Moving a sink, supply or drainCheck the townPlumbing permit and inspection needed, and Illinois requires the work to meet the plumbing code.
New circuits, panel workHire it outRockford permits new and altered wiring. A mistake becomes a fire risk.
Gas lineHire it outA gas leak is the worst outcome in the house, and the towns we checked inspect it.
Countertops, cutouts and seamsHire it outTemplates, seams and heavy slabs are hard to redo.
Setting and leveling cabinetsCarefulEverything after depends on the first cabinet being level.

The rows with a legal rule (plumbing, wiring, permits) follow the Rockford and Illinois rules above. The rest is what we see go well and go wrong.

What the hired parts cost

If you do some of the job and hire the rest, these are the national ranges for the pieces owners most often hand off.

JobNational range
Kitchen sink installation$200 to $650
Appliance installation labor$125 to $300 per appliance
Tile backsplash, typical job$500 to $1,500
Cabinet painting, professional$425 to $1,467
Moving a gas line for a range$375 to $750
Countertop replacement, typical job$1,800 to $4,400
Recessed light, installed$100 to $300 per fixture

Those are labor and install figures, not quotes. Use them to see where a bid sits, and to decide whether the savings from doing it yourself are worth your weekends.

Plumbing, wiring and the inspection

Replacing a faucet, a sink or a dishwasher in the same location with no change to the pipes is exempt from a plumbing permit in Rockford. Anything that moves the pipes needs one. For wiring, replacing receptacles, switches and light fixtures without altering the wiring is exempt, and new circuits are not on the exempt list. A dishwasher on a new circuit is a permit job.

Where DIY stops working

Three things tend to end a DIY kitchen. Time: the kitchen stays torn up while you work around a day job, and a crew does it in a fraction of that. Fit: cabinets, counters and flooring only look right when they are level and the seams meet. Surprises: older houses hide wiring and pipe problems, and our old house kitchen remodel page covers what opens up. In Rockford the median house was built in 1963.

A middle path works well for many owners. Do the demolition, painting and backsplash yourself, hire the cabinet install, countertop and trades, and keep the permit in a licensed contractor's name. If you want to hire for the middle of the job only, the hiring a kitchen contractor page has the questions to ask. For ideas by house type see kitchen remodel ideas, and to get a firm number before you start, the free quote check reads a bid.

Cabinets: paint, reface or replace

Cabinets are the biggest single cost in most kitchens, so they are where owner effort pays or backfires. Painting existing cabinets is the common owner job, and professional cabinet painting runs $425 to $1,467 if you would rather hand it off. Refacing, which replaces the doors and drawer fronts and covers the boxes, runs $4,000 to $13,500. Replacing means new boxes, and that is the job where level, plumb and fit decide how the whole kitchen looks. Our kitchen cabinets page covers the replace path.

If you try the install yourself, order the cabinets before you tear out the old ones, check every box on delivery, and set the first cabinet level before you set anything else. Custom cabinets take 6 to 8 weeks to build, so do not start demolition until they are in your garage.

Hiring a helper

A friend who works for you does not make you a contractor, and a day laborer you pay does not make the job a DIY job. For plumbing, Illinois lets the owner do the work but says any helper has to be a licensed plumber. For lead, anyone paid to disturb paint in a pre-1978 house falls under the EPA rule, even though you do not. Ask your own home insurer how it treats owner-done work and injuries on the job before you start.

Pay for the plan, not the whole job

Another middle path is to hire help with the plan and do the labor yourself. Kitchen designers run $65 to $250, or about 3 percent of the budget. A few hours of a designer's time to check clearances, outlet placement and the order of work can save a rebuild. For ideas by house type, see kitchen remodel ideas, and for small rooms, small kitchen remodel.

Mistakes that cost the most

  • Ordering cabinets before measuring the room as it stands, then finding the walls are not square.
  • Tearing out the old kitchen before the new cabinets and counters are ordered, which leaves you cooking without a kitchen for longer.
  • Moving plumbing or wiring without a permit, then having to open finished walls for the inspection.
  • Skipping lead-safe steps in an old house and spreading dust through the living space.
  • Buying finish materials first and discovering the sink, hood or range needs a different cutout.

Every one of those is cheaper to catch on paper. Measure, sketch the plan with outlets and appliance sizes, and call the building office before you spend. For how long the job runs from start to finish, see the kitchen remodel timeline page.

Safety before you open a wall

  • Shut off and cap water to the area. Know where your main shut-off is before you start.
  • Cut power at the breaker, then test the circuit before you touch a wire.
  • If the house has old wiring such as knob-and-tube, stop and get it looked at by an electrician before anything is covered up.
  • Treat old painted surfaces as lead until tested, and keep dust out of the rest of the house.
  • Do not move a gas line yourself. Hire a licensed pro for gas.

If you do it yourself, do it in this order

  1. Decide the budget first, using the budget kitchen remodel page.
  2. Call the building office about permits before you order anything.
  3. Test old paint, and set up dust control before demolition.
  4. Turn off and cap water, power and gas before opening walls.
  5. Order cabinets and counters before tearing out the old ones, so you are not cooking in the garage longer than needed.
  6. Schedule inspections one full business day ahead in Rockford.

Want a straight price on yours?

Call, text a photo of the kitchen or of a quote you already have, or send the form. The price comes first, in writing.

Questions people ask

Can I do my own plumbing in Illinois?

An owner-occupant of a single-family home may do their own plumbing if it meets the Illinois Plumbing Code and is inspected, and any helper has to be a licensed plumber. Rockford says the same for a resident owner. Your town may be stricter, so call the building office first.

Do I need a permit if I remodel my own kitchen?

Yes where the work calls for one. In Rockford, plumbing and electrical changes need permits unless a fixture is replaced in the same place, and the owner doing the work does not skip the inspection. See the permits page.

How much can I save by doing a kitchen remodel myself?

Labor is about a quarter of the total, so that is the ceiling on what you can save, before tools and mistakes. See the cost page for what each part runs.

What parts of a kitchen remodel are easiest to DIY?

Demolition, painting, hardware and a small backsplash are the common ones. Gas, new wiring, countertops and cabinet leveling are the jobs most owners hand off.

Does the EPA lead rule apply when I work on my own house?

No. The rule covers people paid to disturb paint in pre-1978 homes, not owners working on their own home. The dust is still a hazard, so use lead-safe practices, and the rule does apply to anyone you pay.

How do I start a kitchen remodel?

Set a budget, call the town's building office, measure the room and decide what stays in place, since moving plumbing and gas adds cost. Then get written bids for the parts you will hire out. The budget kitchen remodel page shows how to size it.

Questions about your own kitchen?

Tell us what you want to change and your town. We reply with a price, and no work starts until you agree to it.

Prices and the full service list are on the homepage for kitchen remodeling in Rockford.