Our new cabinet installation service

New cabinets are the biggest single line in most kitchen budgets and the one with the longest wait. Everything else in the room, from counters to flooring, is scheduled around them. If your boxes are sound and the layout works, we price cabinet refacing first, because it can cost less. If the boxes are failing, the layout is changing or you want different sizes, new cabinets are the answer.

Here is what a new cabinet job with us includes:

  • A measure of the room and a plan drawn to scale before anything is ordered
  • The cabinet line, door style and finish named in writing
  • A delivery check, box by box, before the old kitchen comes out
  • Install, leveling and fit, with fillers, toe kicks and end panels
  • Hardware set and doors adjusted so every reveal is even

Kitchen cabinet replacement cost

Installed stock cabinets run $100 to $300, and custom runs $500 to $1,200. Semi-custom sits between the two. We price it from the line you pick, so it is not printed here. Every kitchen is priced after we see it.

GradeInstalled, per linear footOn 30 linear feet
Stock$100 to $300$3,000 to $9,000
Semi-custompriced by the line you pickpriced by the line
Custom$500 to $1,200$15,000 to $36,000

A 30 foot run is a typical 200 square foot kitchen. Measure your own run along the walls, uppers and lowers counted once each. Island cabinets add to it. More numbers are on the kitchen remodel cost page.

Stock, semi-custom or custom

  • Stock comes in fixed sizes from a catalog and ships when ordered. Filler strips cover the gaps. It is the fastest and the cheapest.
  • Semi-custom starts with the catalog and allows changes such as depth, height or extra finishes. It costs more and takes longer.
  • Custom is built to your room. It takes 6 to 8 weeks to build. Lead times vary by maker, so we get a ship date in writing. The custom kitchen cabinets page goes deeper.

Grade describes how flexible the line is, not how well it is built. A stock box from a certified maker can outlast a custom box from a shop that cuts corners. The certification to ask about is ANSI/KCMA A161.1, which requires 14 tests, including 25,000 open and close cycles on doors and drawers and a 600 pounds load on wall cabinets. A missing certificate is not proof of poor quality, but ask for the paperwork.

Lead times and the order of the job

Stock ships when ordered. Custom takes 6 to 8 weeks to build. A typical renovation with new cabinets, counters and appliances runs 4 to 8 weeks of work. Plan the order around the wait: the kitchen remodel timeline page lays it out.

Our rule is simple. We do not demolish your old kitchen until the new cabinets are in and checked. A cabinet order that slips or arrives wrong, with no kitchen to cook in, is the most expensive way to learn that lesson.

What we check on delivery

Most delivery problems are found late, after the boxes are opened in a dark garage. We check before the driver leaves, or the same day.

  1. Count every box against the order sheet and the pick list. Note the count on the delivery receipt.
  2. Open the packaging enough to check for corner damage, cracks, chips and crushed edges. Photograph anything wrong.
  3. Check door style and finish against the sample or the order. A wrong stain or door style costs weeks.
  4. Check sizes against the plan, one cabinet at a time. A measurement error caught now is a reorder. Caught after install, it is a return.
  5. Check that every filler, toe kick, end panel and trim piece is there. Missing trim stops the install on day one.
  6. Keep the packaging and the receipt until every piece is installed.

Measuring your run and planning the order

Start with a drawing, even a rough one. Measure each wall at counter height and again at the ceiling, because older walls drift. Mark windows, doors, vents, outlets, the sink and the range, and the swing of every door. Note where a refrigerator or a dishwasher has to fit. A cabinet plan is only as good as the numbers on it, and the plan is what the order sheet is built from.

Then decide the door style and the finish before you order, not after. Door style is the biggest visual choice. The finish, whether paint or stain, decides how long the surface holds up to cooking and cleaning. Ask for a door sample in your finish and hold it in the room. Choose the pulls at the same time, so the boxes arrive with the right holes or none at all. The cabinet hardware page covers that part.

When we recommend refacing, and what else moves

New cabinets usually pull other work in. Countertops are cut to the cabinets, so templating happens after install. See countertops for how that wait works. A change in the layout needs its own permits for plumbing or electrical, covered on the kitchen layout changes page. A kitchen island is cabinets too, and adds to the footage.

Cabinets alone are exempt finish work in Rockford, and Machesney Park says the same in writing. For other towns, call the permit office before you start. If you are buying the cabinets yourself and want them installed, the RTA cabinets page covers what flat-pack changes about the job.

Want a straight price on yours?

Call, text a photo of the kitchen or of a quote you already have, or send the form. The price comes first, in writing.

Questions people ask

How much does it cost to replace kitchen cabinets?

Installed stock cabinets run $100 to $300 per linear foot and custom runs $500 to $1,200. On a 30 foot run that is $3,000 to $9,000 for stock and $15,000 to $36,000 for custom. Every kitchen is priced after we see it. See the kitchen remodel cost page.

How long do new kitchen cabinets take to arrive?

Stock ships when ordered. Custom takes 6 to 8 weeks to build. Other makers differ, so we get a ship date in writing and do not tear out the old kitchen until the boxes are in and checked.

Is it cheaper to reface or replace cabinets?

It depends on the footage and the grade. On a 30 foot run, refacing can cost more than stock cabinets at the high end. We price both. See cabinet refacing for a picker and a comparison table.

What should I check when cabinets are delivered?

Count the boxes, check for damage, compare the finish and door style to the order, check sizes against the plan, and make sure every filler and trim piece is there. Note any problem on the delivery receipt and photograph it.

What does KCMA certified mean on cabinets?

The line passed ANSI/KCMA A161.1 testing: 14 tests that include 25,000 open and close cycles on doors and drawers and a 600 pound load on wall cabinets. Not every good line is certified, so ask for documents.

Do I need a permit to replace kitchen cabinets in Rockford?

Not for the cabinets alone. Rockford lists cabinets as exempt finish work. Moving a sink or adding outlets is different and needs plumbing or electrical permits. See kitchen remodel permits.

Should I order cabinets before I hire a contractor?

Usually not. The order should match a plan that someone has checked against the room. If you do buy first, see RTA cabinets and ask us before you order.

New kitchen cabinets: get a written price

Tell us what you want to change and your town. We reply with a price, and no work starts until you agree to it.

Prices and the full service list are on the homepage for kitchen remodeling in Rockford.