Skip to content
Text a photo of your quote for a free check.
Hands photographing a printed kitchen quote with a phone

Free Kitchen Remodel Quote Check

Text a photo of the quote you were handed. A person reads it line by line and texts back what is missing. No visit, no obligation.

Get a free quote

We reply with a price. Nothing is booked until you say yes.

Updated

What to expect

How the free quote check works

  1. Step 1

    Snap every page

    Flat on a table, in good light, every page including the fine print and any drawings.

  2. Step 2

    Text it to us

    Send the photos to (815) 706-2052. Our Text buttons start the message for you. Add your town and what the job is.

  3. Step 3

    Get the read back

    A person reads every quote and texts back a plain read: what is there, what is missing, and what to ask before you sign.

How to take a good photo of a quote

Every page
Including terms and conditions on the back. Half the questions live in the fine print.
Flat and square
Lay it on a table and shoot straight down so the lines are not skewed.
No glare
Turn off the overhead light or tilt the page. Glare hides numbers.
Readable numbers
Zoom in on the price lines if the whole page is too small to read.
Say what it is for
Your town, the size of the kitchen and what is changing. One sentence is enough.

How to read a kitchen quote, line by line

These are the lines we check on every quote. When two bids on the same kitchen are far apart, these are the lines to compare first.

How to read a kitchen quote
LineWhat a clear quote showsWhat to ask if it is missing
ScopeEvery room surface and fixture in or out, in wordsWhat exactly is included, and what is not?
AllowancesA dollar amount and what it buys for cabinets, counters, tile, fixturesWhat happens if my pick costs more than the allowance?
Brands and model numbersCabinet line, counter material, sink, faucet, hoodWhich exact product is this price for?
Demolition and disposalTear-out, haul-away and protecting the rest of the houseIs the dumpster or haul-away in this price?
Permit lineWhich permits, and the fee or an allowance for itWhich permits does this job need in my town?
Who pulls the permitThe contractor, by nameAre you pulling the permit, or am I?
DepositA dollar amount at signingWhy this amount, and what does it pay for?
Payment scheduleDraws tied to finished stages, not datesWhat has to be done before each payment?
Change ordersChanges priced in writing before the workHow are hidden problems after demo priced?
WarrantyWhat is covered, for how long, by whomWho do I call if a door sags in a year?
InsuranceA certificate, not just a line saying insuredCan I have your certificate of insurance?
Lead-safe certificationFor a house built before 1978Is your firm EPA lead-safe certified?
Consumer rights pamphletHanded over before you sign, with an acknowledgment formWhere is the pamphlet the state requires?

A sample quote check

Sample quote, not a real job

Not a real customer, contractor or job. It shows the kind of lines that turn up on kitchen quotes and the kind of read you get back.

Sample kitchen quote
Sample quote lineAmount
Demo existing kitchen$2,400
Cabinets, per plan$14,800
Countertops, quartz, allowance$3,000
Tile backsplash$1,200
Plumbing, move sink to island$2,900
Electrical, per code$1,800
Deposit due at signing50 percent

The read we would send back

  • Cabinets, per plan: no brand, line or finish named, and no plan attached. Ask which cabinet line this is and get the plan as part of the contract.
  • Quartz allowance: installed quartz countertops on 40 square feet run from about $600 to $4,800. Ask how many square feet and which slab group the allowance assumes.
  • Moving the sink to the island: that is plumbing work, so a plumbing permit applies in Rockford. There is no permit line. Ask who pulls it and where the fee is.
  • Electrical, per code: fine as a phrase, but how many circuits and outlets? New circuits need an electrical permit too.
  • Half down at signing: Illinois does not cap deposits, but half up front leaves you little leverage. Ask to tie payments to finished stages.
  • Missing entirely: appliance installation, sink and faucet, flooring, drywall and paint, a warranty, and a change order clause.

Change orders: when the price can change

Change orders are where a fair-looking quote can still go sideways. The fair version is simple: a change is priced in writing and agreed before the work is done, hidden conditions found after demolition (rot under the sink, old wiring in the wall) are a fair reason for one, and anything that was in the original scope is not. A quote that says nothing about change orders is worth a question before you sign.

In older Rockford houses the hidden-condition case is real. 60.3% of homes in the city were built in 1969 or earlier, so ask how the contractor prices what turns up behind the walls. The old house kitchen remodel page covers what tends to turn up.

What Illinois law says a quote must include

The Home Repair and Remodeling Act names kitchens. For any job over $1,000 the contractor must give you a written contract with the total cost, the parts and materials listed "with reasonable particularity", any charge for the estimate, and the business name and address. The same law requires the state pamphlet before you sign, disclosure of any arbitration or jury-waiver clause, and contractor insurance of at least $100,000 per person and $300,000 per occurrence for injury and $50,000 for property damage, unless the business is worth $1,000,000 or more. Since August 1, 2025, a clause that lets one side recover attorney's fees works for both sides.

The Home Repair Fraud Act makes it a crime to knowingly misrepresent the terms of a deal or promise work the contractor does not intend to do. The pamphlet also gives you 3 business days to cancel a contract signed at your home. Clause by clause: kitchen remodel contract.

The permit line on a Rockford quote

Rockford figures its fee from the job value: 0.55% of the reported value plus $56 per trade permit and a 10% surcharge, doubled and at least $274 if work starts first. A quote that moves plumbing or wiring and shows no permit line is the first flag we look for. Other towns: kitchen remodel permits.

Before you collect bids at all, the kitchen remodeling contractors page covers who to ask and what to ask, and our kitchen remodel cost page has the prices we read quotes against.

Quote check questions

Is the quote check really free?

It is. You text photos of the quote, a person reads it and texts back a plain read. There is no visit, no fee and nothing to sign, and we do not send marketing texts.

Do I have to hire you after the check?

Not at all. Plenty of reads come back as "this looks complete, ask these two questions and you are fine." If you want a price from us too, say so and we will quote it in writing.

Who reads my quote, and how fast?

A person reads every quote and replies by text. We do not promise a turnaround time, because some quotes are one page and some are twelve.

Can you tell me if the price is fair?

We can tell you which lines sit inside or outside the typical prices on our kitchen remodel cost page, and which lines are vague enough to move later. A fair total for your room also depends on things a photo cannot show, and we point those out.

I have three quotes that are thousands apart. Can you compare them?

Send all three. Start with the lines that usually differ: allowances, cabinet grade, demolition and permits. We line them up so you are comparing the same job.

What should a kitchen contractor give me before I sign?

For any job over $1,000, Illinois requires a written contract with the total cost and the materials listed, and the state pamphlet "Home Repair: Know Your Consumer Rights" with a signed acknowledgment. More on the kitchen remodel contract page.

Send the quote. Keep the read.

Text a photo of every page. A person reads it and texts back what to ask. You decide what happens next.

Prices and the full service list are on the homepage for kitchen remodeling in Rockford.