
Free Kitchen Remodel Quote Check
Text a photo of the quote you were handed. A person reads it line by line and texts back what is missing. No visit, no obligation.
Get a free quote
We reply with a price. Nothing is booked until you say yes.
Updated
What to expect
How the free quote check works
- Step 1
Snap every page
Flat on a table, in good light, every page including the fine print and any drawings.
- Step 2
Text it to us
Send the photos to (815) 706-2052. Our Text buttons start the message for you. Add your town and what the job is.
- Step 3
Get the read back
A person reads every quote and texts back a plain read: what is there, what is missing, and what to ask before you sign.
How to take a good photo of a quote
- Every page
- Including terms and conditions on the back. Half the questions live in the fine print.
- Flat and square
- Lay it on a table and shoot straight down so the lines are not skewed.
- No glare
- Turn off the overhead light or tilt the page. Glare hides numbers.
- Readable numbers
- Zoom in on the price lines if the whole page is too small to read.
- Say what it is for
- Your town, the size of the kitchen and what is changing. One sentence is enough.
How to read a kitchen quote, line by line
These are the lines we check on every quote. When two bids on the same kitchen are far apart, these are the lines to compare first.
| Line | What a clear quote shows | What to ask if it is missing |
|---|---|---|
| Scope | Every room surface and fixture in or out, in words | What exactly is included, and what is not? |
| Allowances | A dollar amount and what it buys for cabinets, counters, tile, fixtures | What happens if my pick costs more than the allowance? |
| Brands and model numbers | Cabinet line, counter material, sink, faucet, hood | Which exact product is this price for? |
| Demolition and disposal | Tear-out, haul-away and protecting the rest of the house | Is the dumpster or haul-away in this price? |
| Permit line | Which permits, and the fee or an allowance for it | Which permits does this job need in my town? |
| Who pulls the permit | The contractor, by name | Are you pulling the permit, or am I? |
| Deposit | A dollar amount at signing | Why this amount, and what does it pay for? |
| Payment schedule | Draws tied to finished stages, not dates | What has to be done before each payment? |
| Change orders | Changes priced in writing before the work | How are hidden problems after demo priced? |
| Warranty | What is covered, for how long, by whom | Who do I call if a door sags in a year? |
| Insurance | A certificate, not just a line saying insured | Can I have your certificate of insurance? |
| Lead-safe certification | For a house built before 1978 | Is your firm EPA lead-safe certified? |
| Consumer rights pamphlet | Handed over before you sign, with an acknowledgment form | Where is the pamphlet the state requires? |
A sample quote check
Sample quote, not a real job
Not a real customer, contractor or job. It shows the kind of lines that turn up on kitchen quotes and the kind of read you get back.
| Sample quote line | Amount |
|---|---|
| Demo existing kitchen | $2,400 |
| Cabinets, per plan | $14,800 |
| Countertops, quartz, allowance | $3,000 |
| Tile backsplash | $1,200 |
| Plumbing, move sink to island | $2,900 |
| Electrical, per code | $1,800 |
| Deposit due at signing | 50 percent |
The read we would send back
- Cabinets, per plan: no brand, line or finish named, and no plan attached. Ask which cabinet line this is and get the plan as part of the contract.
- Quartz allowance: installed quartz countertops on 40 square feet run from about $600 to $4,800. Ask how many square feet and which slab group the allowance assumes.
- Moving the sink to the island: that is plumbing work, so a plumbing permit applies in Rockford. There is no permit line. Ask who pulls it and where the fee is.
- Electrical, per code: fine as a phrase, but how many circuits and outlets? New circuits need an electrical permit too.
- Half down at signing: Illinois does not cap deposits, but half up front leaves you little leverage. Ask to tie payments to finished stages.
- Missing entirely: appliance installation, sink and faucet, flooring, drywall and paint, a warranty, and a change order clause.
Change orders: when the price can change
Change orders are where a fair-looking quote can still go sideways. The fair version is simple: a change is priced in writing and agreed before the work is done, hidden conditions found after demolition (rot under the sink, old wiring in the wall) are a fair reason for one, and anything that was in the original scope is not. A quote that says nothing about change orders is worth a question before you sign.
In older Rockford houses the hidden-condition case is real. 60.3% of homes in the city were built in 1969 or earlier, so ask how the contractor prices what turns up behind the walls. The old house kitchen remodel page covers what tends to turn up.
What Illinois law says a quote must include
The Home Repair and Remodeling Act names kitchens. For any job over $1,000 the contractor must give you a written contract with the total cost, the parts and materials listed "with reasonable particularity", any charge for the estimate, and the business name and address. The same law requires the state pamphlet before you sign, disclosure of any arbitration or jury-waiver clause, and contractor insurance of at least $100,000 per person and $300,000 per occurrence for injury and $50,000 for property damage, unless the business is worth $1,000,000 or more. Since August 1, 2025, a clause that lets one side recover attorney's fees works for both sides.
The Home Repair Fraud Act makes it a crime to knowingly misrepresent the terms of a deal or promise work the contractor does not intend to do. The pamphlet also gives you 3 business days to cancel a contract signed at your home. Clause by clause: kitchen remodel contract.
The permit line on a Rockford quote
Rockford figures its fee from the job value: 0.55% of the reported value plus $56 per trade permit and a 10% surcharge, doubled and at least $274 if work starts first. A quote that moves plumbing or wiring and shows no permit line is the first flag we look for. Other towns: kitchen remodel permits.
Before you collect bids at all, the kitchen remodeling contractors page covers who to ask and what to ask, and our kitchen remodel cost page has the prices we read quotes against.
Quote check questions
Is the quote check really free?
It is. You text photos of the quote, a person reads it and texts back a plain read. There is no visit, no fee and nothing to sign, and we do not send marketing texts.
Do I have to hire you after the check?
Not at all. Plenty of reads come back as "this looks complete, ask these two questions and you are fine." If you want a price from us too, say so and we will quote it in writing.
Who reads my quote, and how fast?
A person reads every quote and replies by text. We do not promise a turnaround time, because some quotes are one page and some are twelve.
Can you tell me if the price is fair?
We can tell you which lines sit inside or outside the typical prices on our kitchen remodel cost page, and which lines are vague enough to move later. A fair total for your room also depends on things a photo cannot show, and we point those out.
I have three quotes that are thousands apart. Can you compare them?
Send all three. Start with the lines that usually differ: allowances, cabinet grade, demolition and permits. We line them up so you are comparing the same job.
What should a kitchen contractor give me before I sign?
For any job over $1,000, Illinois requires a written contract with the total cost and the materials listed, and the state pamphlet "Home Repair: Know Your Consumer Rights" with a signed acknowledgment. More on the kitchen remodel contract page.
Sources (9)
- Illinois Home Repair and Remodeling Act, 815 ILCS 513
- Illinois Home Repair Fraud Act, 815 ILCS 515
- City of Rockford, permit FAQ
- City of Rockford, Electrical Permits
- City of Rockford, permit fee schedule (undated PDF)
- EPA, Renovation, Repair and Painting Program: contractors
- Angi, kitchen remodel cost
- CostToRenovate, countertop material cost comparison
- U.S. Census Bureau, ACS 2020-2024 5-year, via Census Reporter
Send the quote. Keep the read.
Text a photo of every page. A person reads it and texts back what to ask. You decide what happens next.
Prices and the full service list are on the homepage for kitchen remodeling in Rockford.